Name

Enter a name you’ll recognize, such as “House in Downtown”, then tap Save.

Use Elecq Partner to set up an installation site. Start by signing in, then enter the details for the location where you’ll install the charger.
If you already use the ELECQ App, tap Log In and use the same account. If you’re new to ELECQ, tap Sign Up and follow the registration prompts.

Enter your email or phone number and password, then tap Log In. To sign in with a code, select Log In with Verification Code.

If you’re setting up your own charger or haven’t been trained as an installer by a partner organization, a private site is usually the quickest and simplest way to get started. Choose Create New Public Site if you need to configure multiple circuits and manage load balancing across them.
On the Install tab, under Personal Installation, tap Create New Private Site.

Give the site a name. If you allow Elecq Partner to use your phone’s location during installation, it automatically fills in Region, Address and Time Zone. Check these against the installation site, or set them manually.
Select a field in the screenshot to see how to edit it.


Enter a name you’ll recognize, such as “House in Downtown”, then tap Save.

On the Country/Region screen, search for and select the installation country or region.

Search for the installation address or tap Use Current Location while on site. Check the address beneath the map and tap Save.

Search for and select the local time zone for the installation site.
Once the site details are correct, tap Setup Site to continue.
After entering the site information, tap Setup Site. On 1/4 Settings, review load balancing, network settings, and charger current limits. An asterisk marks a required setting.
Select a setting in the screenshot to see its screen and instructions.


Choose the mode that matches your installation. This choice determines how the chargers share power and what equipment you need to configure.

Open WiFi to configure the site’s wireless network on Add Network.

Use APN when setting up mobile data on a charger that uses a SIM card. Ask the mobile network operator for the required APN settings before entering them.
Note: On models without eSIM, only the APN settings for SIM Card 1 take effect. Leave the SIM Card 2 APN fields blank.

Enter the mobile network operator’s settings for the SIM entry you selected.

Turn AP Mode on to share the Master Charger's internet connection with other chargers on the same circuit. Connect the Master Charger to the internet via 4G, Ethernet or Wi-Fi.

Current Limit sets the maximum charging current for each charger at this site. Once applied to the chargers, this safety limit caps the current throughout charging. Users cannot raise it through the ELECQ App.
Enter the limit in amps specified by the installation design, then tap Save. The screenshot shows 32 A.

By default, Single Phase Current Limit inherits the charger’s Current Limit. In a three-phase home, you can set a lower limit for single-phase charging to reduce the imbalance between phases.
Select the limit in amps and tap OK. This setting applies only to single-phase charging. Three-phase charging keeps its configured current limit.
In Setup Site → 1/4 Settings → Load Balancing, select Basic (no other loads). Use the installation design to fill in Site Power, then review Network and Charger Settings. The values below illustrate one site.
* Required settings. Read each setting marked with a red asterisk carefully and complete it for your installation.


Select Basic (no other loads) for a circuit dedicated to EV charging. The site distributes current among its chargers within the configured breaker limit.

Enter the site’s main breaker rating in amps and tap Save. Basic mode uses this setting when sharing current among the chargers. The example installation uses 40 A.

This setting is optional. Leave it blank to use the Main Breaker value. If the installation has a separate breaker for EV charging, enter its rating in amps and tap Save. The field accepts 6–10,000 A.

Select the earthing system specified for the installation. The app groups TN and TT under TN/TT and lists IT separately.

Select the supply type recorded for the site. The app offers Single Phase, Three Phase and Two Wire Single Phase. The example uses Three Phase.

Review the phase connection against the installation design. The three-phase example shows L1, L2, L3.

Reserved current gives the site an extra safety margin. The chargers keep this current available and exclude it from the current allocated to vehicles. Set aside only the margin your installation needs. A high percentage can significantly slow charging.
Scroll to the percentage of current to reserve, check the equivalent value in amps, and tap OK. With a 40 A main breaker, selecting 5% reserves 2 A.

Keep Ripple Control Off unless your energy supplier or local regulations require it. If it is required, consult a qualified installer and follow their instructions when configuring the inputs and charging power percentages.

Enter the percentage specified for input state 0, then tap Save.

Example entry: 0%. Use the percentage specified for this installation.
Enter the percentage specified for input state 1, then tap Save.

Example entry: 100%. Use the percentage specified for this installation.
The example editor shows 0% and 100%. Assign each state the percentage required by the site’s demand-response scheme, then save the Ripple Control configuration.

Open WiFi to configure the site’s wireless network on Add Network.

Use APN when setting up mobile data on a charger that uses a SIM card. Ask the mobile network operator for the required APN settings before entering them.
Note: On models without eSIM, only the APN settings for SIM Card 1 take effect. Leave the SIM Card 2 APN fields blank.

Enter the mobile network operator’s settings for the SIM entry you selected.

Turn AP Mode on to share the Master Charger's internet connection with other chargers on the same circuit. Connect the Master Charger to the internet via 4G, Ethernet or Wi-Fi.

Current Limit sets the maximum charging current for each charger at this site. Once applied to the chargers, this safety limit caps the current throughout charging. Users cannot raise it through the ELECQ App.
Enter the limit in amps specified by the installation design, then tap Save. The screenshot shows 32 A.

By default, Single Phase Current Limit inherits the charger’s Current Limit. In a three-phase home, you can set a lower limit for single-phase charging to reduce the imbalance between phases.
Select the limit in amps and tap OK. This setting applies only to single-phase charging. Three-phase charging keeps its configured current limit.

The charger uses this fallback current when load balancing is unavailable, for example if it loses communication with the Master Charger. In the example shown, the charger uses 6 A while load balancing is unavailable.
Enter the fallback current in amps and tap Save.
When the settings match the installation, tap Next Step.

On 2/4 Device & Circuit, make sure the charger is powered on. Select By Bluetooth and tap Add Charger under the circuit.

Elecq Partner scans for nearby chargers over Bluetooth. Wait for the scan results.

Match the serial number in the scan results to the label on the charger you want to add. Tap that charger to add it to the circuit.

Check Added count to confirm the charger was added. Use the back arrow to return to Device & Circuit.

Verify that the charger appears under the circuit. If the app reports that a newer firmware version is available, you can update the charger over the internet after installation is complete. Tap Next Step to continue.
In Setup Site → 1/4 Settings → Load Balancing, select Adaptive (with other loads) when the chargers share the site supply with other electrical loads. Adaptive mode uses site current measurements to adjust the charging current as those loads change.
* Required settings. Complete every setting marked with a red asterisk. Select a row in the screenshot to see its setup instructions.

Select Adaptive (with other loads), then open Site Current Sensor to configure the measurement device used by the site.

Select the measurement device and connection method used at the site. This example uses Power Monitor via Wireless. If the Power Monitor is connected by RS-485, select Power Monitor via RS-485.
Before selecting another current sensor, confirm that Elecq has integrated that exact device and that you know how to install and configure it. Elecq Partner can configure only devices that Elecq has integrated.
For the setup shown, open Sensor Type and, for a CT, select the matching CT Specification. Tap OK to save the sensor settings.

Elecq Power Monitors come with current transformers. If you’re using the CTs supplied with your Elecq Power Monitor, select CT (Current Transformer). Select Rogowski Coil only if that is the supported sensor installed at the site.

European Elecq Power Monitor models EE103 and EE105 come with 100 A/100 mA CTs. If you’re using those supplied CTs, select 100 A/100 mA. For another supported CT, match the rating printed on the CT.

After reviewing the site settings, tap Next Step. If prompted to confirm the load balancing mode change, tap Confirm to continue or Cancel to return to the settings.

Use an NFC-capable phone. Elecq Power Monitor can only be added and configured via NFC.


In Setup Site → 1/4 Settings → Load Balancing, select Solar. Choose how the charger uses available solar and grid power, then configure the site current sensor.
* Required settings. Complete every setting marked with a red asterisk. Select a row in the screenshot for instructions.

Select Solar to configure charging for a site with solar generation. Open Solar Mode to choose how charging uses solar and grid power.


With Solar Priority, use this setting to limit the current drawn from the grid to supplement solar charging. Enter the desired value in amps and tap Save. The example shows 6 A.

Select the installed measurement device, its connection method and the matching sensor settings. The example uses Power Monitor via Wireless.
Tap OK to save the sensor settings.
After you finish configuring the circuit in 2/4 Device & Circuit, tap Next Step to open Circuit Overview at 3/4 Settings. The review works the same across load balancing modes.

Check the site name, site ID, region, address and time zone.

Review the load balancing mode and the saved site power, network and charger settings. The screenshot shows a Solar configuration. The options displayed depend on the mode you selected.

Check the circuit and make sure the expected chargers and any required site monitor appear. The example shows one master charger and one site monitor.
After reviewing all three tabs, tap Next Step to open 4/4 Functional Tests.
Use the final installation step to test each charger before completing setup.

On 4/4 Functional Tests, tap the charger you want to test. Repeat the checks for each charger in the circuit.

Make sure the charger is powered on. Connect a vehicle if you want to run the charging test, then tap Go Testing. The app checks connectivity and runs the available tests, including the RCD module test.

Review Network, Fault Code, Config Comparison and Test Items. The overall result can show Abnormal whenever a check is incomplete. For example, the charging test may be incomplete if no vehicle was connected. Check the individual results and any fault codes before tapping Save.
Immediately after an intentional RCD Test, the charger may briefly report an RCD test fault as part of the test. Unplug and reconnect the charging cable to clear that temporary report. If the fault persists, stop charging and contact Elecq Support.

Review the test summary. Tap Cancel to return to the results if further checks are needed. Tap Confirm when you’re ready to save the results. Back on the test list, tap Complete to finish installation.

On Site Info, check that Status shows Installed.
After functional testing, hand the site over to its owner or let them claim the charger in the Elecq App.

After completing the functional tests, tap Transfer at the bottom of Site Info. Enter the email address associated with the owner’s Elecq account, then tap Confirm to give them access to the site.
To skip the transfer, tap the exit icon in the upper-right corner of Site Info. The owner then claims the charger in the Elecq App using its serial number (SN) and PIN.

When Transfer successful appears, you can exit Elecq Partner. The owner can sign in to the Elecq App with the receiving account and see the transferred site and charger on the Site home screen.

Use the Elecq App to operate the charger and adjust supported settings that don’t affect installation safety. For details, see the Elecq App Guide.
Review installation history and update a site’s details or configuration in Elecq Partner.

On the Install home screen, tap Sites in the bottom navigation.

Open My Created to see the sites you’ve installed. Tap a site in the list to view its details.

Tap the search icon in the upper-right corner to find your past installations or sites installed by other members of your organization. Enter the start, end, or all of the device serial number (SN). Uppercase and lowercase both work.

Open a site from the list or search results. In Site Info, tap Continue to Edit when available.

On Edit Installable Site, tap Save to keep changes to the site details. To correct the installation configuration, tap Setup Site.